Document preservation projects at the Glass House
|
Glass House shrouded for protection, temporary construction path to house |
initial inspection of the brick cylinder |
cutting mortar joints for disassembly of brick cylinder |
|
roof sheathing repairs |
loading materials to rooftop |
roof deck, dense deck, and insulation |
|
beginning flashing for brick cylinder |
lead coated copper through wall flashing at brick cylinder |
new lead coated copper flashing, tying into original cast iron drain bowl |
|
final flood coat and gravel surface |
lead-coated edging and tie-in to roof membrane |
new lead coated coping on re-constructed brick cylinder |